Students huddled talking on campus

MALT Industrial Assessment Center

MALT Industrial Assessment Center

MALT-IAC

The MALT Industrial Assessment Center (MALT-IAC) performs free energy assessments for qualifying small and medium facilities in the Mississippi, Arkansas, Louisiana, and Texas Piney Woods Region. The MALT-IAC performs these assessments for businesses within 150 miles of Louisiana Tech University, Grambling State University, or the University of Louisiana – Lafayette.

Members of the MALT-IAC will conduct on-site assessments and — within 60 days of the assessments — provide recommendations for:

  • Energy and Water Savings,
  • Wastewater Treatment and Management,
  • Smart Manufacturing/PHM,
  • Cybersecurity,
  • Predictive Maintenance,
  • Resiliency Planning, and
  • Decarbonization/Electrification.

In addition to the free energy assessments, the MALT-IAC will support undergraduate and graduate students, providing them with hands-on experience and professional training using energy assessment tools, technology, and techniques. Students who work with the MALT Center will learn industrial processes, energy assessment procedures, and energy management systems.

MALT US Map

Step 1: Pre-Assessment Information Gathering

The client is sent a Pre-Assessment Form that includes:

  • The size of the plant and plant layout,
  • Industry type (SIC/ NAICS code) and process description,
  • Production levels in units and dollars, operating hours,
  • A one-year history of utility bills, and
  • A list of major energy-consuming equipment.

Step 2: Involve Key Plant Personnel

The Louisiana Tech team will reach out to key plant personnel, including:

  • The plant manager,
  • Energy manager,
  • Environmental personnel, and
  • Maintenance personnel.

Step 3: Pre-Assessment Analysis

To prepare for the on-site energy assessment, our team will take the information that you provide us and create a pre-assessment analysis. This process includes:

  • Analyzing the manufacturing process,
  • Charting and graphing utility bills,
  • Analyzing utility bills for trends and errors and establishing the unit cost of energy at the plant,
  • Identifying key energy systems,
  • Reviewing design and other technical documentation,
  • Identifying possible energy saving potential recommendations using the IAC database, and
  • Developing an assessment day strategy.

Step 4: Day of the Assessment

After introductions on the day of the on-site assessment, your team will provide us with a:

  • Description of the manufacturing process and operations and Plant tour.

After the tour, our team will then provide you with:

  • A meeting room debriefing and brainstorming session,
  • Review of notes,
  • A refined list of opportunities to be investigated, and
  • An exit interview.

If warranted, our team will also install temporary devices to gather more data.

Step 5: Post-Assessment Activities

After the assessment, our team will complete the following:

  • Conduct an engineering and financial analysis;
  • Create an industrial assessment center report that includes:
    • An executive summary,
    • A plant description,
    • A process description,
    • Resource charts and tables,
    • A list of major energy-consuming equipment,
    • A list of recommendations for best practices to save money, and
    • A description of each individual energy-saving recommendation;
  • Follow-up on the report with:
  • A call to the client in two weeks to ensure the report was delivered and answer questions,
  • A call to the client in six to nine months for implementation data,
  • An upload of the data to the IAC database, and
  • An inquiry about the potential for a case study of the project(s).